KNR Engineering experienced specialists help energy clients deliver uninterrupted power with start-to-finish support for transmission line engineering initiatives including transmission line design, upgrades, uprating, corridor routing, retrofits, reconductoring, and more.
We help clients meet their goals with an innovative, multidisciplined team of civil, structural, and electrical engineers and technicians that has been recognized for transmission line siting and engineering; standards development; transmission structure foundation design and research; reliability-based transmission design and assessment; and failure analysis.
KNR delivers unparalleled expertise in foundation investigations, computer modelling, corridor mapping, design, and construction management—as well as comprehensive services for new above-ground lines and structures (34.5kV to 765kV) and underground lines and manholes (69kV to 345kV).
KNR HAS A MULTIDISCIPLINE TEAM OF CIVIL, STRUCTURAL AND ELECTRICAL ENGINEERS TO
SUPPORT COMPLETE TRANSMISSION ENGINEERING SERVICES.
Range of services
- ROW, topographic and utilities survey
- Overhead line design
- Corona and EMF performance analysis
- Tower modelling, analysis & design
- Sag studies, analysis and design
- Tower spotting
- Tower grounding design & footing resistance
- Tower foundation design
- Transmission line construction manual
- Insulation coordination study
- Structural Design Of Latticed Towers, Poles And Frames
- Line Gantries
- Profiling Using Software With Integrated Terrain Modeling
-
Conductor Sizing and Selection
- Single Line Diagram
- STADD Analysis Report
- Foundation Design and Drawing for all types of soil
- Tower Drawing, Elevation & Clearance Drawing
- Sag Tension Chart - Mathematical Optimization
- Technical Support for testing of Transmission Line Tower at Recognized
Testing Centre
- Transmission Line Hardware Estimation
- Procurement Support
Our clientele includes wind farm developers and giants in power industry
We have completed over 25 assignments of transmission line design and engineering up to 765kV since inception in 2003